F-104G 22+61 JaboG 34 F-104G, construction number 683D-7142, company model 683-10-19, built by Messerschmitt (MTT) assembly start at Messerschmitt-Manching on December 17, 1963, assembly in Fighterbomber version according contract lot 5 first flight April 15, 1964 coded KE+442; project "Diana" in Fighterbomber version (for JaboG 34) with installed M61 20 mm Vulcan machine gun camouflage scheme "Norm 62" according tech order "TA-196"; acceptance date June 9, 1964 by BABwMTT DD+243 JaboG 34 at Memmingen AB delivery date on June 24, 1964 22+61 IRAN at SABCA on January 9, 1971 with 907 flight hours, back to JaboG 34 on March 15, 1971 EL-70/EL-73 Electronic Counter Measure (ECM) system was installed in the weapon system in the late 70s with tech order "TA-FL1191" operated with flightdate and crash recorder LEADS 200 according tech order "TA-1411"; withdrawn from use in 1987 struck off charge order (AVA) January 26, 1987; instructional airframe (GIA) at Memmingen AB in 1987 with training aid code "C015" June 30, 1996 airlifted with CH-53 helicopter and displayed at "Flugtag" at Tannheim (west of Memmingen) with CH-53 helicopter airlifted to Kaufbeuren AB on March 13, 2003; instructional airframe (GIA) at "Ausbildungswerkstatt der Luftwaffe/TSLw 1 Kaufbeuren" (training workshop) September 15, 2009 noted; April 2014 last noted; April 2016 transport to Norvenich AB; stored Taktisches Luftwaffengeschwader 31 (TaktLwG 31) May 2016 noted instructional airframe (GIA) Lehrlingswerkstatt Halle A 1 February 7, 2017 noted; August 2024 noted. Project "Diana": delivery of 42 Fighterbomber with built-in Vulcan M61 20 mm machine gun for 1st and 2nd Squadron of Jagdbombergeschwader 34 (FBW 34) at Memmingen, later the number of aircraft was increased to 48. copyright © Mühlböck collection badge of 2nd squadron JaboG 34 "Edelweiss"